1.5L Bordeaux Wine Bottle, 5715CG, Champagne Green, Screwcap (case of 6)
Premium 1.5L Bordeaux wine bottle in elegant champagne green glass, featuring a convenient screwcap finish. The tall, classic Bordeaux shape with full shoulder enhances the presentation of fine wines and provides professional packaging for your finished products. Perfect for magnum-sized bottling.
- Capacity: 1.5L (Magnum)
- Style: Bordeaux Bottle
- Color: Champagne Green
- Closure: Screwcap-ready neck
- Model: 11-5715CG
- Case Configuration: 6 bottles per case
The full shoulder design and tall profile create an elegant presentation, while the champagne green glass provides UV protection for your wine. The screwcap closure provides convenient opening and resealing. The 1.5L magnum size is perfect for special occasions and aging wine.
Minimum Order: 1 Pallet (64 Cases)
6 bottles/case
|
|
|
|
|
|
| DIAMETER (in / mm) |
|
|
|
|
|
|
|
|
|
|
| CASE QTY | 6 |
**Interested in printed bottles? $0.75 per bottle plus a one time $40 screen fee (for all first time orders). If interested please give us a call at 844-482-9463.