Growler 64oz- Amber Glass Beer Bottles (Pallet of 48 Growlers)
Premium growler 64oz amber glass bottles designed for breweries, taprooms, and beer retailers. These 64 oz growler bottles feature UV-protective amber glass that preserves beer freshness and flavor while providing the professional quality your customers expect.
Product Features:
- Growler 64oz Capacity: Perfect size for brewery fills
- Amber Glass Protection: Blocks harmful UV rays
- Professional Grade: Brewery-quality glass construction
- Durable Design: Built for repeated use in commercial settings
- Standard Neck: Compatible with most growler caps
Perfect for: Breweries, taprooms, brewpubs, and beer retailers looking for reliable 64 oz growler bottle supplies.
Note: Growler caps sold separately. Contact us for volume pricing on multiple pallets.
Bulk Ordering Information:
- Sold by Pallet: 8 cases per pallet
- Case Pack: 6 growlers per case
- Total per Pallet: 48 growlers
There is a $40 screen fee for all FIRST TIME logo orders. Please be sure to also add to your cart. All submitted artwork is subject to review before a design is approved for printing on the selected glassware. We can only print a single Pantone color for glasses and growlers. Any alteration of artwork to become production ready is eligible for a Design Fee, billed in 15 minutes increments. For more details contact: sales@wineandbeersupply.com
|  |  | 
|  |  | 
| DIAMETER |  | 
|  |  | 
| LABEL PANEL HEIGHT | 4.594 in | 
| LABEL PANEL WIDTH (360 | 15.224 in | 
| FINISH TYPE |  | 
|  |  | 
**Interested in 2 logos? Or custom ink? Give us a call at 844-482-9463.
 
          
         
    
 
    
 
    
 
    
 
 
 
